Daily rest period is where a shift plan breaks first in practice. In late October a logistics company in Pratteln called: late shift until 22:30, early shift at 06:00, seven and a half hours between them. The planner had calculated cleanly, just not with Article 15a.
Swiss labour law grants at least eleven consecutive hours between two working days. Squeezing the daily rest period saves an hour of wages and invites a question from the labour inspectorate.
The number is simple. Keeping it across a month of shifts is the harder part, so the sections below deal with the exception, the rotation rule and the records.
Contents
- 1. Daily rest period and the eleven hours of Article 15a
- 2. Where the eleven hours break in everyday planning
- 3. Reducing to eight hours with compensation
- 4. Shift rotation and the six-week rule
- 5. Shift plan, absences and records in one place
Daily rest period: what Article 15a requires
Under Article 15a of the Labour Act, employees are entitled to a daily rest period of at least eleven consecutive hours between two working days. Company size, sector and workload make no difference.
For apprentices and young workers the SECO guidance is stricter and names twelve hours. Someone leaving a late shift at 21:00 at the age of 16 cannot start again at 07:00.
Article 22 rules out buying the rest period: rest periods may not be settled with money or other benefits, except at the end of the employment relationship.
For planning this means a daily rest period cannot be calculated away. It belongs visibly in the plan, and a surcharge of 20 francs does not replace eleven hours of sleep.
Where the eleven hours break in everyday planning
The most expensive mistake rarely sits in the weekly plan. It sits in the handover from one week to the next, when the planner looks at Saturday evening and Monday morning as separate entries.
A care service with twelve employees in Grenchen knows the pattern: late shift until 21:30, next assignment at 08:00, ten and a half hours. On paper that is tight. Once travel time is added it becomes a borderline case.
In a bakery the dough is in the oven at 04:00 while the shop's late shift ends at 22:00. There the daily rest period becomes arithmetic for the branch manager.
Only real times show this, not the target plan. In an inspection what counts is what was recorded, not what the system holds as a default.
A company that can only show the plan and does not know the actual times has little to offer when asked whether the rest period was kept. Records close that gap. A story told afterwards does not.
For twelve employees one list per week is enough. What matters is that the last assignment of one day and the first of the next sit on the same line.
Reducing to eight hours with compensation
Article 15a paragraph 2 allows a reduction to eight hours for adult employees, at most once a week. The condition is that the eleven-hour average is maintained over two weeks.
Across a shift change it is the easiest exception to justify. That does not make it the normal case.
The SECO guidance adds two points: the compensation happens within two weeks, and no overtime may be ordered for the next assignment after a shortened rest period.
Anyone using the exception writes it down: date, person, size of the reduction and day of compensation. Two lines in the plan folder are enough as evidence.
If the daily rest period slides to eight hours every week, it is no longer a single case but a pattern, and patterns are what an audit picks up first.
Shift rotation and the six-week rule
Article 25 sets the second limit. Nobody may work the same shift for more than six consecutive weeks.
With two-shift work, day and evening, those affected must have an equal share of both. Night work follows the same logic with day and night shifts.
With the consent of those affected, and under the conditions set by ordinance, the period can be extended or the rotation waived entirely. Without that consent it stays at six weeks.
The weekend has its own rule: between Saturday 23:00 and Sunday 23:00 work is generally prohibited, and exceptions need a permit from SECO or the cantonal authority.
A daily rest period across a weekend is therefore an administrative route, not a planner's free decision. Without the permit, planning without a Sunday shift is safer.
A rotation plan that changes the shift after six weeks meets the requirement automatically and can be shown in the calendar. A rotation agreed only verbally is lost at the first sick leave.
Shift plan, absences and records in one place
Eleven hours cannot be planned when calendar, timesheet and absences live in three systems. Puveno's shift planning and time tracking keeps the assignment in the calendar, the hours per person and the absences in one view.
The overtime viewer calculates against the defined target hours, and the monthly report shows as a PDF which shift was actually worked. How breaks fit in between is covered in the article on break rules in Switzerland.
When shift start is tied to the time record, a short daily rest period shows up in the report the next morning rather than at an inspection. The times stay with the company instead of in a spreadsheet on a team leader's laptop.
Take the plan and three handovers: late to early shift, weekend to Monday, night to day work. Where less than eleven hours sit between them, the gap belongs in the plan and not in a footnote.
A plan that respects the daily rest period costs an hour of arithmetic per month. A follow-up procedure costs more.
This article is general information, not legal advice.